● Shovel Ready — All Permits Secured

Shibiyunji Solar PV Project

A 65 MWdc / 44 MWac utility-scale solar PV plant with 15 MWh battery storage, located in Shibiyunji District approximately 70 km east of Lusaka, Zambia. Expandable to 130 MWdc / 88 MWac in Phase 2.

PPA Offtake Status
Signed with ZESCO
PPA Type
Take or Pay
PPA Duration
25 Years
PPA Tariff
9.5 US¢/kWh
44MW
Phase 1 AC Output Capacity
112GWh
Annual Generation to Grid
101ha
Land Area (99-year lease)
80.6%
System Performance Ratio

Opportunity Highlights

Transaction Structure

Investment Opportunity

  • Dukinfield owns 100% of Shibiyunji Solar Limited, the Zambian-registered SPV
  • Investors may acquire all or part of the SPV directly
  • Alternative: invest in or fund Dukinfield to access the full pipeline
  • Dukinfield can act as EPCM on behalf of investors to oversee construction
  • Technical Service Agreement (TSA) available for ongoing project oversight
  • Land held by Agrismart Zambia Ltd under a Rental & Transfer Option Agreement with Shibiyunji Solar Limited
  • All agreements in place — construction can commence on financial close

System Performance Data

Independent energy yield assessment confirms strong, bankable generation across all months of the year.

Parameter Value
Average Electricity Exported to Grid112.3 GWh/year
Specific Yield1,728 kWh/kWp
Normalised Production1,728 kWh/kWp/yr
Array Losses460 kWh/kWp/yr
System Losses460 kWh/kWp/yr
Performance Ratio80.6%
Capacity Factor19.5%
Global Horizontal Irradiation2,153 kWh/m²/yr

Generation Profile

The PEG system configuration with East–West panel orientation delivers a broader, flatter generation curve across the day compared with conventional south-facing installations — maximising total energy output and reducing peak curtailment risk.

Consistent Daily Generation

The East/West orientation spreads generation evenly across daylight hours, providing a more predictable and bankable power output profile for ZESCO and private offtakers.

Average irradiation of 2,153 kWh/m²/year positions Shibiyunji among Zambia's strongest solar resource sites — consistent throughout the year with no significant seasonal deficit.

Plant & Equipment

Phase 1 Plant Specification

ComponentSpecification
Solar PV Modules104,832 units (620Wp each)
DC System Capacity65 MWdc
AC System Output44 MWac
Solar Inverters20 units
Smart Transformer Stations10 units
Substation33/88 kV
Grid ConnectionLine-in Line-out to 88kV substation
Battery Storage15 MWh (power stabilisation)
Panel ConfigurationPEG East/West orientation

Phase 2 Expansion

ParameterValue
Additional DC Capacity+65 MWdc (same site)
Total DC Capacity130 MWdc
Total AC Output88 MWac
Site Adequacy101ha accommodates full Phase 2
Grid Upgrade PathZESCO plans 88kV → 132kV upgrade
Additional PV Modules~104,000 additional units
ZESCO Grid Upgrade

ZESCO plans to upgrade the adjacent 88kV line to 132kV, which would accommodate the Phase 2 expansion output of 88 MWac without further grid investment by the project.

101 Hectares — Secure 99-Year Lease

Location Shibiyunji village, ~70 km east of Lusaka City; 22 km off the M9 (Lusaka–Mumbwa) highway
Traditional Authority Consent Full consent granted by His Royal Highness Senior Chief Shakumbila and the local council — consent letter formally executed February 2024
Land Transfer Land transferred to Agrismart Zambia Ltd; Ministry of Land approval secured
Land Zoning Converted from traditional/customary use → agricultural use → industrial use — full zoning process complete
Investor Permit Zambian Development Agency Investor Permit in progress, enabling foreign entities to hold land for 99 years under Zambian law
SPV Land Agreement Shibiyunji Solar Limited to hold a Rental and Transfer Option Agreement with Agrismart Zambia Ltd over the 101ha parcel
Construction Readiness Structure allows construction to commence immediately on financial close — no land title delays
Community Land Additional 50ha offered by Chief Shakumbila for ESG and community agricultural programmes
Site Location

Shibiyunji, Central Province

ProvinceCentral Province, Zambia
DistrictShibiyunji District
Distance from Lusaka~70 km east
Distance from M9~22 km off Lusaka–Mumbwa road
Distance to 88kV LineAdjacent (on site)
Distance to Grid Substation~23 km (Nampundwe–Sanje 88kV)
Site Area100.14 ha (approx.)
Lease Term99 years
Surveyed ByMZIP/1/903, Central Province

Implementation Timeline

Construction to commissioning estimated at approximately 12 months from financial close.

March 2025
Acquisition of Government Approvals
All permits, licences, clearances and government endorsements formally received — Implementation Agreement with ERB signed
April 2025
Connections Agreement Signed
ZESCO Connections Agreement formally executed, confirming 88kV LILO grid connection point
September 2025
Financial Close & Contracts Effective
Financing secured; EPC and O&M contracts become effective; construction programme commences
4
October 2025
Procurement of EPC Contractor
EPC contractor formally procured and mobilised; materials procurement and site preparation begin
5
May 2026
Main Civil Works Completed
Civil, structural and electrical works complete; panel installation and inverter commissioning in progress
6
June 2026
Project Completion & Commissioning
Final commissioning, testing and performance verification completed; plant energised and synchronised to grid
7
TBC 2026
Acquisition of Generation Licence
ERB Generation Licence formally awarded following commissioning
8
TBC 2026
Commercial Operation Date (COD)
Commercial Operation Date declared; PPA revenue commences; 25-year offtake period begins

Transaction Structure

UK HoldCo
Dukinfield Energy Ltd
Zambian NGO
Agrismart Zambia Ltd
↕ Transaction Perimeter
Zambian SPV
Shibiyunji Solar Limited
Up to 100% acquirable
Contract
PPA
Agreement
TSA
Tenure
Land

Offtake Options

  • ZESCO (primary): Take-or-pay PPA, 25 years, 9.5 US¢/kWh — contracted and signed
  • SAPP: Southern African Power Pool regional market access via ZESCO wheeling
  • Industrial/Private: Direct supply to Copperbelt mining companies and DRC smelters — premium pricing potential
Request Investment Information →